Public versions of the same workflows the workspace uses — takeoff, scale grid, cable routes, and field forms. Sign in for project-scoped help.
- Getting startedFirst-run path: create a project, upload drawings, process sheets, then review and continue to forms or field punch.
- Takeoff and quantitiesConvert approved detections into entities, generate takeoff lines, and verify scale so quantities are trustworthy.
- Field formsOpen digital forms by project phase, complete required fields, and let status submit when the record is complete. PMs and company safety use Safety and Closeout audits for policy and packet review.
- Door hardware scheduleBring the door schedule off the drawing and into the project so marks, hardware sets, and readers stay attached to the sheet.
- Scale-accurate gridCalibrate the sheet, overlay a measured grid, and snap devices and cable to real-world spacing so markup matches Dist.
- Cable routes on the sheetPlan homeruns on the issued drawing with measured length, a scale grid, and a schedule the field can land against.